The project work area is the Wind Power Station in Kırklareli Vize.

It is subject to Production License by Energy market Inspection Board with EÜ/3683-2/2234 number. It is 5200 acres.

The majority of the land is forest area and there are also agricultural fields.

Villages of Evrencik and Sofular and Traçim Cement factory is inside the work area.

Airborne Lidar method is preferred due to limited duration and forested areas.

At the end of the project orthophoto of an area 5200 acres wide and  digital topographic map has been approved by Province Administration and topographic map sections, land model and vertical obstruction maps were produced.