
Under the “Zambia Railway Rehabilitation Project”, we have successfully completed the geodetic studies, aerial lidar and photogrammetric mapping studies, and rail surveying services for the railway line with a length of approximately 1025 km. We would like to thank everyone who contributed to this project..